The crane is intended for mechanization of load handling and storage operations at a wharf and for transfer of heavy large-size loads at ambient temperatures from - 40˚C to + 40˚C.
Specifications
| Crane lifting capacity, t: | |
| total | 320 |
| on the separate hooks | 160 |
| Span, m | 70 |
| Quantity of trolleys, nos. | 2 |
| Hook lifting height, m | |
| total | 45 |
| above crane rail head | 30 |
| Lifting speed, m/min | 2 |
| Traveling speed, m/min | |
| crane | 20 |
| trolley | 10,5 |
| Supply voltage of power network, V | AC 380 |





